Cgf18-18-6 Pet Bottled Mineral Water Filling Machine Production Line Canning Machine

Products

Cgf18-18-6 Pet Bottled Mineral Water Filling Machine Production Line Canning Machine

Cgf18-18-6 Pet Bottled Mineral Water Filling Machine Production Line Canning Machine

CGF18-18-6 Pet Bottled Mineral Water Filling machine Production Line Description:This CGF Wash-filling-capping 3-in-1uni

Send your inquiry

DESCRIPTION

Basic Info
Model NO. CGF
Dosing Device Capacity Cup
Filling Principle Gravity
Packaging Container Lifting Structure Pneumatic Lifting
Structure Rotary
Packaging Bottle
Packaging Material Plastic
Control PLC
PLC Mitsubishi
Status New
Quality High
Processing Type Water
Transport Package Wooden Packages
Specification ISO9001
Trademark Beyond
Origin Zhangjiagang, Jiangsu, China
HS Code 8422301090
Production Capacity 20sets Per Month
Product Description
CGF18-18-6 Pet Bottled Mineral Water Filling machine Production Line

Cgf18-18-6 Pet Bottled Mineral Water Filling Machine Production Line Canning Machine


Description:This CGF Wash-filling-capping 3-in-1unit: Beverage Machinery is used to produce polyester bottled mineral water, purified water, alcoholic beverage machinery and other non-gas beverage machinery. The CGF Wash-filling-capping 3-in-1unit: Beverage Machinery can finish all the process such as press bottle, filling and sealing, it can reduce the materials and Outsiders touch time, improve the sanitary conditions, production capacity and economic efficiency.Pure water mineral water bottling machine washing part:The rotary wheel is a fully SUS304 stainless steel welded structure. The machine applies unique overturning bottle clamp. This bottle clamp grips bottle at neck position, avoiding bottle mouth thread contamination caused by rubber gripper block of a traditional bottle clamp. Made of SUS304 stainless steel, this bottle clamp is hygienic and durable. The high efficiency atomizing spay nozzle installed on bottle clamp is capable of cleaning any part of bottle inner wall, and also saves rinsing water. All sliding bushes of lifting device use Igus (Germany) anti-corrosion maintenance free bearing. The rinser is driven by driving system positioned inside machine frame via gear transmission. Transfer Starwheel Made of stainless steel of superior quality. Equipped with bottle jam protection device. Pure water mineral water bottling machine filling part:Rotary wheel fully made of stainless steel SUS 304. Gravity filling method. Filling valves are made of SUS316L. Filling valves are reasonably structured with accurate filling. Filling flow can reach 200ml per second. Bottles go up and down in the function of cam through elevator, to process filling with contact to bottle-mouth. Level of cylinder is controlled with float-ball. Filler is driven through gears inside the machine frame. Link-wheels in rinser, filler and capper are transported in ringed support of bottle-neck Pure water mineral water bottling machine capping part:Cap distributing chute is equipped with reverse cap stop and reverse cap pick-out mechanism. Cap distributing chute is equipped with a photocell switch to stop the capper when there is no cap inside the chute. The capper is equipped with inlet bottle detection switch. Centrifugal way of cap arranging is adopted to reduce damage of caps.
A cap inspecting system is applied to control on-off of elevator.

ModelCGF14125CGF18186CGF24248CGF323210CGF404010
Heads of washing, filling , sealing14-12-518-18-624-24-832-32-1040-40-12
Production capacity (bottle/hour)3000-50005000-70008000-1200012000-1500016000-20000
Suitable bottle diameter(mm)φ=50-100 H=170 330-1500ml
Spraying pressure2~3
Motor powerMain
motor 4.23kw
Main motor5.03kwMain motor 6.57kwMain motor7.5kwMain motor 8.63kw
Power of outer vacuum pump0.71.11.52.22.2
overall dimension (LxWxH)2100x1400x25002460x1720x26503100x2100x26503500x2500x26504600x1800x2650
Weight25003500420055006800

Cgf18-18-6 Pet Bottled Mineral Water Filling Machine Production Line Canning Machine

Cgf18-18-6 Pet Bottled Mineral Water Filling Machine Production Line Canning Machine

Cgf18-18-6 Pet Bottled Mineral Water Filling Machine Production Line Canning Machine

Cgf18-18-6 Pet Bottled Mineral Water Filling Machine Production Line Canning Machine



Service Term

1. InstallationThe initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled. While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below. When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals. 2. TranslatorIf translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.Company Information:

ZHANGJIAGANG BEYOND MACHINERY CO., LTD. is a group company located in Sanxing Industrial Park, Zhangjiagang City, Jiangsu Province, China.

For beverage machine, our main products including:

*The capacity of 2000-- 30000 BPH for juice and tea hot filling producing line.

*The capacity of 2000 -- 30000 BPH for mineral water and purified water producing line.

*The capacity of 2000 -- 30000 BPH for carbonated beverage and cold filling producing line.

*The capacity of 1000 - 8000 BPH for vinegar and alcohol and oil producing line.

*The capacity of 100 -- 2000 BPH for 1 and 3 and 5 gallon barrel producing line.

*The capacity of 2000 -- 10000 BPH for soybean milk and peanut milk and other plants protein drink producing line.

*2~20T/H water treatment equipment(mineral water and pure water).

*PET perform inject and blowing-stretching machine.

Relevant equipments: Bottle unscrambler/Full bottle overturn sterilizer/Concentrating equipment/Plate and tube UHT device/CIP system/Labeling machine/Auto film shrinking packing machine.

We carry a strict quality management system in accordance with ISO9001 requirements. We have established a complete processing line including design and manufacture and sale and after sale service. Our products are well sold around the world.

We are proud to adhere to our company slogan "Engineering Excellence". Please be free to contact us for more information and we are ready for making business relations with you in the near future

Q:What are you main products?

A:Zhangjiagang Beyond Machinery is a 12-year-old manufacturer specializing in the production of beverage filling machinery and equipment. We have been certificated by the famous cercification authority.

The products include: beverage filling machiner,hot filling production line, Pure water filling machine, pure water production equipment, oil filling machine; beer can(bottle) filling machine;milk filling production line, 5 gallon filling production line , carbonated soft drink production line , big bottle water filling production line , three-in-one filling machine, beverage equipment, etc.

Similiar equipments contain water treatment plant ,PET bottle blowing machine,bottle unscramber machine,labeling machine,packing machine,sterilizer,date printer,etc.

We can help you to start a new company in beverage production line .we make all of our customers be satisfied with the machine and our service.Any question about this machine or our factory ,please contact us ,sincerely serve for you .

Q:How can I install my machine when it arrives?
A:We will send the engineers to install and test the machines and have training lessons abroad, but the Visa fee, round tickets, accommodation, eating, and the allowance of 80USD per day per person will be on customer's side.

Or the customer can send the engineer to our company to complete the inspection of the goods, as well as the installation and training lessons ,but the Visa fee, round tickets, accommodation, eating, and the allowance will be paid by customers .

Q:What's your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 2 years guarantee . we will give u free spare parts in 2 years.

If during the warranty period, the quality or specification of the goods is found to be inconsistent with the contractual requirements, or if the goods are found to be defective (including potential defects or the use of unqualified materials, etc.), the buyer has the right to use the inspection documents issued by the statutory authority. During the warranty period of the goods, the buyer shall make a claim against the seller.

Q:Where is your company located?How can i visit there?
A:Our factory is located in XiGang jinfeng town,zhangjiagang City,Jiangsu Province,China.

You can fly to Shanghai Pudong International Airport and we are warmly welcome to visit us.(Provide pick-up service.)

Q:How can l get some samples?
A:We have no sample.we will send you more pictures and video about this machine,and welcome to visit our factory to see the machine running in the factory.

Q:How about the quality of your products.

A:Our company guarantees that the products provided are brand new, unused, with the latest design and suitable materials, and comply with the quality, specification and performance of the contract in all respects.

Q:What's the delivery time?
A:7-45 days after the T/T deposit or L/C.(The premise is to receive customer's samples and deposit).

Q:What about Product's material and configuration use?

A:304 stainless steel, the machine frame material is iron. According to customer requirements, 316 stainless steel is available , complete machine stainless steel, and customers demand specified configuration.